The BeachHouse


Work In Progress... 

All drawings completed in April 2011

Construction started 23 July 2013

Construction time estimated at 12 to 14 months.

 

Below a computer generated 3D video of the final drawings.



 

Split level lay out

 

Level +2 :     Observation deck (in tower) with 360 degrees views (mountains and sea)

 

Level +1 :     Above the main entrance hall (in tower)

                          -Home theatre room

 

Level +0.5 : Private 2 bedroom /bathroom apartment with living room, kitchen and terrace

 

Level   0.0 : Main entrance hall (in tower) with staircases giving access to all upper and lower floors

 

Level  -0.5:  Below the private appartment

                         -Main living room

                         -Dining room

                         -Main kitchen and storage rooms plus outside dirty kitchen area

 

 

                     Large outside terrace with infinity edge plunge pool, BBQ, Gazebo and storage room

 

Level -1 :     Below the main entrance hall

                        -Comfort rooms

                      

Level -1.5 : Basement

                       -Vaulted wine cellar

                       -Small storage room

                       (both connecting with main living room through seperate staircase)

                       

                    Below the terrace

                       -Four guest rooms with ensuite bathrooms with circular staircase access to terrace above

                       -Guest reception, lounge (below gazebo) with private access to guest rooms and beach

                       -Linen room 

                       -Storage room

                       -Technical, pump room

 

 