The BeachHouse
Work In Progress...
All drawings completed in April 2011
Construction started 23 July 2013
Construction time estimated at 12 to 14 months.
Below a computer generated 3D video of the final drawings.
Split level lay out
Level +2 : Observation deck (in tower) with 360 degrees views (mountains and sea)
Level +1 : Above the main entrance hall (in tower)
-Home theatre room
Level +0.5 : Private 2 bedroom /bathroom apartment with living room, kitchen and terrace
Level 0.0 : Main entrance hall (in tower) with staircases giving access to all upper and lower floors
Level -0.5: Below the private appartment
-Main living room
-Dining room
-Main kitchen and storage rooms plus outside dirty kitchen area
Large outside terrace with infinity edge plunge pool, BBQ, Gazebo and storage room
Level -1 : Below the main entrance hall
-Comfort rooms
Level -1.5 : Basement
-Vaulted wine cellar
-Small storage room
(both connecting with main living room through seperate staircase)
Below the terrace
-Four guest rooms with ensuite bathrooms with circular staircase access to terrace above
-Guest reception, lounge (below gazebo) with private access to guest rooms and beach
-Linen room
-Storage room
-Technical, pump room